Mini-Hydropower Development Projects (4 provinces)

Under the auspice of JICA/MIME, the services of KCEC were retained to make a simple river profile surveys on the 4 rivers in the 4 provinces of Battambang, Rattanakiri, Stung Treng and Koh Kong, in May – June 2005. Two (2) teams of surveyors were provided to do the works for a period of 20

(Read More…)

Rural Electrification (RE) and High Tension Line (HL) Project

• Socio-Economics Study for the Assessment of a Strategy for RE and HL Implementation, Sub-Consultant to Worley (New Zealand), April – December 2000. • World Bank Loan (Total Cost: N/A) • Works done by KCEC: – Survey Design and Training of Interviewers – Field Interviews by 30 interviewers and 5 inspectors in 17 provinces of

(Read More…)

Sihanoukville Sea Port Extension

• Construction of new berths, buildings and appurtenant civil works in the existing port, as Sub-Consultant to PCI Tokyo (Japan), 2000-2007 • Japanese Loan (Total Cost: 40,000,000 USD) • Works done by KCEC: – Review of Feasibility Study – Architectural Design of Buildings (13 Units) – Structural Design – Detailed Drawings – Technical Specifications –

(Read More…)

Calmette Hospital – Cardiology Center

•    Detailed Structural Design and Supervision of Works, as sole consultant, 1999-2000. •    Three (3) Storey Building in Reinforced Concrete. •    Private Fund (Total Cost: 1,500,000 USD). •    Works done by KCEC: –  Soil Investigation for the design of foundation –  Structural Design –  Supervision

Movable Access Steel Bridge to Floating Naga Casino and Port

• Architectural and Structural Design, and Supervision of Works, as sole consultant, 1995-1996. • Earth Concrete and Steel Works • Private Fund (Total Cost:  1,000,000 USD) • Works done by KCEC: – Hydrologic and Hydraulic Studies of the Mekong River – Soil Investigation of the River Bed and Laboratory Testing – Land and River Bed

(Read More…)

Rehabilitation of 10 MW Kirirom Hydro-Power Plant

• Assessment Study for the Rehabilitation of the 10 MW existing Kirirom Power Plant, as sole consultant. • Repair of Power House, Penstock and 110 KV High Tension line, Additional Storage Reservoir (Total Cost: 35 Millions USD). • National Budget • Works done by KCEC: – Data Collection ( Previous Studies, Hydrologic and Energy Consumption

(Read More…)

Mekong River Bank Protection

• Proposals of Urgent Works for Bank Protection, in association with Dumez GTM (France)- 1996. • Protection of river bank at the 4 arms of the Mekong River at Phnom Penh (Koh Norea). • National Budget (Total Cost: 35 Millions USD). • Works done by KCEC: – Data Collection (Previous Reports, Hydraulic and Hydrologic, Topographic,

(Read More…)

Prek Tatam Dredging Project

• Pre-Feasibility Study, of Prek Tatam Canal, Prey Veng, in association with Dumez GTM (France)-1996. • Project of dredging an existing canal for irrigation, navigation and fishing purposes. • National Budget (Total Cost: 4.5 Millions USD). • Works done by KCEC: – Topographical Survey – Socio-Economic Interview – Environment Study – Work Methods – Cost