• Assessment Study for the Rehabilitation of the 10 MW existing Kirirom Power Plant, as sole consultant.
• Repair of Power House, Penstock and 110 KV High Tension line, Additional Storage Reservoir (Total Cost: 35 Millions USD).
• National Budget
• Works done by KCEC:

– Data Collection ( Previous Studies, Hydrologic and Energy Consumption ).
– Power & Energy Generation
– Cost Evaluation
– Financial and Economic Study