• Construction of new berths, buildings and appurtenant civil works in the existing port, as Sub-Consultant to PCI Tokyo (Japan), 2000-2007
• Japanese Loan (Total Cost: 40,000,000 USD)
• Works done by KCEC:
– Review of Feasibility Study
– Architectural Design of Buildings (13 Units)
– Structural Design
– Detailed Drawings
– Technical Specifications
– Technical Assistance during works execution