Flood Emergency Rehabilitation Project for RN1, 2, 11 and 21 (Saang –Koh Thom)

• JV with SWK (UK) and BCEOM (France), March 2002 to April 2004. • Construction supervision • Client : MPWT Cost : N/A Fund : ADB • Works done by KCEC: – Quantity and Quality Control – Laboratory testing – Claims – Daily Reports

RN 51 Rehabilitation Project (Oudong – RN4)

• In association with LBI (USA), March 2002 to November 2002. • Detailed Engineering Design and Bid Evaluation. • Client : MPWT Cost : N/A Fund : WB • Works done by KCEC: – Topographical Survey – Soil Investigation/Foundation/Quarry – Hydrological/Hydraulic Survey – Environmental Assessment – Structural/Drainage Design – Structural Design of road, bridge, culverts

(Read More…)

Samart Building

• Consultant for Civil Works, January – September 2002 • Construction of 1 Four – Storey Building at Pochentong Airport Area, along RN4, Phnom Penh. • Client : Samart Telecom Cost : N/A Fund : Private • Works done by KCEC: – Review of Structural Design. – Design of the Prestressed Prefabricated Preslabs for the

(Read More…)

Lvea and Dangkhao Rural Bridges

• General Consultant to TRIP (German Aid), January 2002. • Bridge constructions in 2 rural areas • Client : TRIP Cost : N/A Fund : German Government • Works done by KCEC: – Topographical Survey – Design of Foundation – Structural design of pier, abutments and Wingwalls

Catholic Churches (Toul Kork)

• Construction of a Second Church in Phnom Penh City, underway (2002). • Study and detailed drawings, bidding documents. • Client : The Church of Jesus Christ of Latter-Day Saints Cost : 600,000 US$ Fund : Private • Works done by KCEC: – Topographical Survey – Soil Investigation and Foundation study – Structural Design –

(Read More…)

RN3 Rehabilitation Project (Kampot – Trapeang Ropeou – 32 Km)

• Sub-Consultant to Korea Consultant International (KCI), September 2001 to February 2002. • Feasibility Study for the rehabilitation of 32 Km of road and bridges from Kampot to Trapeang Ropeou. The remained 21 Km is underway of rehabilitation by WB. • Client : Ministry of Public Works and Transports Cost : 5,000,000 US$ Fund :

(Read More…)

Rehabilitation of National Road No 7

• Sub-Consultant to Nippon Koei (Japan), November – December 2000. • Rehabilitation of RN 7, from Tonle Bet Mekong Bridge to Snoul, Kompong Cham Province. • Client : Ministry of Public Works and Transport Cost : N/A Fund : Japan • Works done by KCEC: – Topographical Survey and Mapping – Geotechnical Investigation for borrow

(Read More…)

Siemreap Victoria Hotel

• Sub-Consultant to Cochin Architects (France), February – March 2000. • Construction of a 100 bed hotel in Siemreap city • Client : Private Cost :  N/A Fund : Private • Works done by KCEC: – Soil Investigation, Laboratory Testing – Foundation Study – Technical Specification for Structural Design

Slakou River Basin Development

• Sub-Consultant to Nippon Koei, February – April, 2001. • Pre and Feasibility Study for the development of the Slakou River, Takeo Province, for the irrigation purpose. • Client : Ministry of Water Resources and Meteorology Cost : N/A Fund : Japan (JICA) • Works done by KCEC: – Topographical Survey and Mapping – Geotechnical

(Read More…)

Prek Chrey Colmatage Channel (RN1)

• Technical Assistance provided to the Project, Sub-consultant to Taisei Corporation (Japan), November 2000 – March 2001. • Construction of Colmatage Channels along RN1 for Water control and Irrigation works for dry season plantations and rice. • Client : Ministry of Water Resources and Meteorology Cost : N/A Fund : Japan • Works done by

(Read More…)