• JV with SWK (UK) and BCEOM (France), March 2002 to April 2004.
• Construction supervision
• Client : MPWT
Cost : N/A
Fund : ADB
• Works done by KCEC:
– Quantity and Quality Control
– Laboratory testing
– Claims
– Daily Reports
• JV with SWK (UK) and BCEOM (France), March 2002 to April 2004.
• Construction supervision
• Client : MPWT
Cost : N/A
Fund : ADB
• Works done by KCEC:
– Quantity and Quality Control
– Laboratory testing
– Claims
– Daily Reports