• Technical Assistance provided to the Project, Sub-consultant to Taisei Corporation (Japan), November 2000 – March 2001.
• Construction of Colmatage Channels along RN1 for Water control and Irrigation works for dry season plantations and rice.
• Client : Ministry of Water Resources and Meteorology
Cost : N/A
Fund : Japan
• Works done by KCEC:
– Topographical Survey for contour line mapping
– Longitudinal survey and cross-sections
– Implementation of works