Home » Past_Experience » C6 Phnom Penh Thermal Power Plant (5 MW)

C6 Phnom Penh Thermal Power Plant (5 MW)

The Contractor KC MKK Co. Ltd. was awarded with a contract by EDC to construct in 94-95 the Building of the Power Plant, the drainage system and the landscaping works. KCEC assisted the Contractor for the Construction Management and supervision for Quality Control.

•    Construction Supervision
•    Client : EDC
•    Contractor : KC MKK Co. Ltd
•    Consultant : KCEC (as partner of KC MKK)
•    Cost : 2,000,000 US$
•    Fund  : JAPAN
•    Works done by KCEC.
–    Revision of drawings and redesign if any
–    Contract administration (quality, cost and schedule)
–    Construction supervision of Civil Works, electrical installation and mechanical works (generators, transformers, coolers, control devices,…)
–    Contract Variations
–    Claims to the client
–    Manpower (skill and unskilled)
–    As-build-drawings
–    Commissioning
–    Taking over to the client