MPWT, the Executive Agency of this ADB funded project, has decided to rehabilitate the National Road no 5 from Poipet to Sisophon (Bantay Mean Chey), the National Road no 6 from Sisophon to Siemreap city, the Road 56 from Sisophon to Samrong (Otdar Mean Chey), and the Road 68 from Samrong to Kralanh (Siem Reap).
Korean Consultant International (KCI) won the contract for the supervision of the construction in association with KCEC as a sub-consultant.
The contract period in from December 2004-December 2007 (3 years).
• Client : MPWT
• Consultant : KCI
• Sub Consultant : KCEC
• Cost : N/A (Construction Cost)
• Fund : ADB
• Works done by KCEC :
– UXO Detection (surface & deep search)
– GPS and high accuracy leveling.
– Detailed topographical and soil investigation survey
– Design of roads, bridges and culverts
– Laboratory testing of materials
– Construction supervision
– Approvals of Contractor’s Claims
– Daily & monthly Reports