• Design and Build Project of construction of new access roads to Angkor city KCEC/BCEOM (France) as JV consultant and Khaou Chuly MKK Co., Ltd as contractor, December 2000 to June 2002.
• Construction of 10 Km of asphalt coated new access road to the Angkor city including 1 new bridge on the Siemreap river.
• Client : APSARA Authority
Cost : 3 Millions US$
Fund : AFD (France)
• Works done by KCEC:
– Topographical Survey
– Soil Investigation and Foundation Study
– Hydrologic and Hydraulic analysis for the design of bridge and drainage works.
– Construction materials
– Design of roads, bridges and culverts
– Cost estimate
– Supervision of works execution