• Quality Control, Sub-consultant to KC MKK Co., Ltd (Cambodia), November 1997-December 1998.
• Construction and Rehabilitation of 3 prisons.
• Client : Ministry of the Interior
Cost : 1 Millions US$
Fund : Australia
• Works done by KCEC:
– Quality Control (Survey, Quantity)
– Revision of Drawings
– Laboratory Testing