• Design , detailed drawings and Specifications for the construction, as Sole Consultant (Underway of Construction), 1997 – 1998.
• Construction of a new shrine on the top of the mountain.
• Funded by National Budget (Total Cost : 3,5 Millions US$)
• Works done by KCEC:
– Laboratory Testing
– Topographical Survey and Contour Lines Mapping
– Structural and Electrical Design, detailed drawings and Specifications
– Supervision of Works and Quality Control