• Detail Drawings and Supervision of the Construction of the Drainage system, Buildings and Runway, as Local Consultant to Dumez GTM (France), 1996 to 1997.
• Rehabilitation works
• Private Fund, under BOT Process (Total cost: 7.4 Millions US$).
• Works done by KCEC:
– Design of the Drainage System inside the Airport.
– Topographic Control of the Works
– Quality Control of Materials, Concrete and Works.
– Rights, Permits and Authorizations