• Feasibility Study as Sole Consultant, for Water Supply and Environmental Impact
Assessment (1997).
• Project of the Construction of a new Cement Plant, by the Tong Yang – KCD JV.
• Private Fund ( Total Cost : 200 Millions US$ )
• Works done by KCEC:
– Topographical Survey and Contourlines Mapping
– Water Supply (water needs, hydrology, hydraulics of surface and underground water , pumping station, pipe network ).
– Environment Impact Assessment ( impact on human, animal and natural
resources, during and after the construction, mitigation measures,…)
– Quality Control of Roads and Ponds Works
– Rights, Permits and Authorizations.