• Feasibility Study, as Local Consultant to Cargill Technical Services ( USA ), 1997.
• Project of the Construction of Dam, Power House, and the Rehabilitation of the existing Irrigation and Drainage Network
• Funded by ADB
• Works done by KCEC:
– Topographical Surveys of the dam axis, irrigation headworks and canals (cross sections, profiles, contour lines mapping).
– Drainage and Irrigation Network Analysis (Head gates, canals and water needs).