Home » Articles posted by KCEC (Page 6)

Author Archive:


Socio-Economics Survey, RN 6A, 6, 7 and 61

• Sub-Consultant to Central Consultant Inc. (CCI), Japan, from October 2002 to February 2003 • Socio-Economics Survey for health, disease and poverty matters due to the improvement of National Roads. • Client : Ministry of Public Works and Transport Cost : N/A Fund : Japan • Works done by KCEC – Same works as described

(Read More…)

RN1 Rehabilitation Project (Monivong Bridge – Neak Luong Ferry – 60 Km)

• Sub-Consultant to PCI (Japan) and Katahira & Engineers International (Japan), from June to September 2002. • Feasibility Study • Client : MPWT Cost : N/A Fund : Japan Government • Works done by KCEC: – IEIA (Initial Environment Impact Assessment) – ISIA (Initial Social Impact Assessment)

Emergency Flood Rehabilitation Project for RN 5,6,7, Roads 129, 130, 222, 223, 57, 68, 70 and 71, and Railways

• In association with SMEC (Australia) and Meritec (New Zealand) from August 2000 to May 2004. • Construction Supervision • Client : MPWT Cost : N/A Fund : ADB • Works done by KCEC – Quantity and Quality Control – In situ and in laboratory check of materials – Daily Reports – Meetings

Flood Emergency Rehabilitation Project for RN1, 2, 11 and 21 (Saang –Koh Thom)

• JV with SWK (UK) and BCEOM (France), March 2002 to April 2004. • Construction supervision • Client : MPWT Cost : N/A Fund : ADB • Works done by KCEC: – Quantity and Quality Control – Laboratory testing – Claims – Daily Reports

RN 51 Rehabilitation Project (Oudong – RN4)

• In association with LBI (USA), March 2002 to November 2002. • Detailed Engineering Design and Bid Evaluation. • Client : MPWT Cost : N/A Fund : WB • Works done by KCEC: – Topographical Survey – Soil Investigation/Foundation/Quarry – Hydrological/Hydraulic Survey – Environmental Assessment – Structural/Drainage Design – Structural Design of road, bridge, culverts

(Read More…)

Samart Building

• Consultant for Civil Works, January – September 2002 • Construction of 1 Four – Storey Building at Pochentong Airport Area, along RN4, Phnom Penh. • Client : Samart Telecom Cost : N/A Fund : Private • Works done by KCEC: – Review of Structural Design. – Design of the Prestressed Prefabricated Preslabs for the

(Read More…)

Lvea and Dangkhao Rural Bridges

• General Consultant to TRIP (German Aid), January 2002. • Bridge constructions in 2 rural areas • Client : TRIP Cost : N/A Fund : German Government • Works done by KCEC: – Topographical Survey – Design of Foundation – Structural design of pier, abutments and Wingwalls

Catholic Churches (Toul Kork)

• Construction of a Second Church in Phnom Penh City, underway (2002). • Study and detailed drawings, bidding documents. • Client : The Church of Jesus Christ of Latter-Day Saints Cost : 600,000 US$ Fund : Private • Works done by KCEC: – Topographical Survey – Soil Investigation and Foundation study – Structural Design –

(Read More…)

RN3 Rehabilitation Project (Kampot – Trapeang Ropeou – 32 Km)

• Sub-Consultant to Korea Consultant International (KCI), September 2001 to February 2002. • Feasibility Study for the rehabilitation of 32 Km of road and bridges from Kampot to Trapeang Ropeou. The remained 21 Km is underway of rehabilitation by WB. • Client : Ministry of Public Works and Transports Cost : 5,000,000 US$ Fund :

(Read More…)

Rehabilitation of National Road No 7

• Sub-Consultant to Nippon Koei (Japan), November – December 2000. • Rehabilitation of RN 7, from Tonle Bet Mekong Bridge to Snoul, Kompong Cham Province. • Client : Ministry of Public Works and Transport Cost : N/A Fund : Japan • Works done by KCEC: – Topographical Survey and Mapping – Geotechnical Investigation for borrow

(Read More…)

KHMER CONSULTANT ENGINEERING CORPORATION LTD.(KCEC)     #54B, Street 222, Sangkat Boeung Raing, Khan Daun Penh, Phnom Penh, Cambodia     Tel: (855)-23 218258, Tel/Fax: (855)-23-724108     E-mail: ISAR@online.com.kh